Scope of works :
full fit out works for 06 floor including plaster , paint ,ceramic tiles , joinery works , false ceiling , lighting , electrical works , plumbing , air condition
Full MEP Works ( full mechanical , Electrical , Plumbing works for the full building ) including 03 No’s off transformers with total
connected load 3411 kw.
02 No’s off stand by generator with 450 KVA capacity
Fully integrated fire alarm system
Full low current systems ((access control system, CCTV system, gate. barrier, audio intercom system, lighting control system…etc…
Central battery system with 06 panels
Firefighting protection system including sprinklers, fire hose cabinet, FM200 system, prep action system for lift machine room and foam system for generator room.
DX split AC units 300 AC units GRP water tank, transfer pump,booster pump, sanitary ware and bathroom accessories.